Announcements
Three Rubloff window panels to be replaced Monday, 6/9
June 154, 2014
Three large window panels are scheduled to be replaced on the east side of the Rubloff building (facing Lake Michigan) on Monday, June 9. One is on the first floor in the lobby outside of Thorne Auditorium. Two are on the second floor of the library. The work will all be performed on the exterior of the building, but could be somewhat disruptive inside in areas near those worksites.
peter.walters@law.northwestern.edu
(312) 503-3863