Announcements
Rubloff lobby terrazzo floor refinishing
August 225, 2014
The terrazzo floor in the Rubloff building lobby at 420 East Superior is scheduled to be refinished Wednesday, 8/13 and Thursday, 8/14 beginning at 6:00pm each evening. The 420 East Superior lobby and the adjacent elevator lobby serving the south side Rubloff will be closed in sections on those two nights. After 6:00pm on those dates, please use stairwells rather than those elevators. If you require the use of an elevator during these hours, please feel free to contact me
peter.walters@law.northwestern.edu
(312) 503-3863